Time Codes Table of Contents
Blanket Work Orders
63189 | December | Temporary N/C Blanket WO | ||||||
63190 | December | Pole Replacement Blanket WO | ||||||
63191 | December | Cutout/Arrester/Combo Replacement | ||||||
63192 | December | Security Light Construction | ||||||
63193 | December | Misc. Unit Replacement | ||||||
63194 | December | Security Light Replacement | ||||||
1000 | December | Accident/Damage Blanket WO | ||||||
5459 | December | Security Light Retirement |
Safeguards/Signals /Lights
Install complete light unit for residential – security light construction blanket w/o (107.20)
Remove complete light unit to retire light – security light retirement blanket w/o (108.80)
Remove complete light unit to replace light – security light replacement blanket w/o (108.80)
Replacing bulbs. (585.00)
Routine patrolling for lamp outages. (585.00)
Inspecting of time switches and other controls. (585.00)
Disconnect when people move. (585.00)
Replacing any light part other than a bulb. (596.00)
Repairing safeguard wire OH or UG. (596.00)
Meet electrician to check on street lighting. (596.00)
Service/Secondary
Replacement or new installation of temporary services. (107.20)
Replacement or new installation of primary, secondary and service wire. (107.20)
Replacement or new installation of ALL secondary pedestals. (107.20)
Maintenance of underground conduits, conductors and devices and UG services. (594.00)
Moving position of service either on pole or on consumer’s premises. (593.00)
Billable work on consumers’ premises-setting meter poles or pole consumer buys. (456.11)
Reroutes of underground service less than (10) feet. (594.00)
Kill service and/or transformer. (587.00)
Open service at transformer for member equipment changes. (587.00)
Disconnecting a service at transformer (Requires line crew). (903.00)
Benefit Time
Paid Time Off. (242.80)
Holiday or Bereavement. (926.00)
Consumer Interaction
Collecting electric bills and memberships. (903.00)
Disconnecting and reconnecting service because of non-payment of bills. (903.00)
Disconnecting a service at transformer (Requires line crew) (903.00)
Billable work on consumer’s premises-problem-their side of meter. (456.11)
Billable work on consumer’s premises-installing pole top disconnects. (456.11)
Billable work on consumers’ premises-setting meter poles or pole consumer buys. (456.11)
Non-billable–member problems. (587.00)
Other misc. services on consumer premises performed by outside operation crews. (587.00)
Wiring inspections. (587.00)
Kill service and/or transformer. (587.00)
Open service at transformer for member equipment changes. (587.00)
Transformer
Installing and removing conv. and csp transformers. (583.00)
Installing and removing PM, RR and submersible transformers. (584.00)
Replacement or new installation of HL-45 lids and feed thru. (107.20)
Kill service and/or transformer. (587.00)
Open service at transformer for member equipment changes. (587.00)
Disconnecting a service at transformer (Requires line crew). (903.00)
Records for transformers–including numbering and other expenses incurred in keeping transformer records.(588.00)
Materials purchased to be used to repair transformers. (595.00)
Any labor chargeable for transformer repair. (595.00)
Table of Contents
Substation
Inspecting and Testing substation equipment (592.00)
Any time/material for maint. of sub or storage battery equipment, regulators, etc. (592.00)
Transferring loads/switching/reconnecting circuits and eqpt for maintenance purpose. (592.00)
Operating switching and other station equipment. (582.00)
Care of grounds–including mowing, snow removal and weed control. (582.00)
Gravel on drives and substation sites. (582.00)
Lines-Overhead
Replacement or new installation of primary, secondary and service wire. (107.20)
Replacement or new installation of complete anchor and guy assemblies. (107.20)
Replacement or new installation of individual arresters and cutouts. (107.20)
Trimming trees and clearing brush for NEW overhead lines. (107.20)
Outage time (overhead lines). (593.00)
Routine patrolling of lines. (583.00)
Relocating or moving lines or section of lines. (593.00)
Resagging, retying or rearranging position of conductors, guy markers. (593.00)
Replacement of suspensions. (593.00)
Repairing safeguard wire OH. (593.00)
Pulling slack in service wire. (593.00)
Refastening or tightening service bracket. (593.00)
Transferring loads, switching / reconnecting circuits and equipment for ops purposes. (583.00)
Transferring loads, switching/reconnecting circuits and eqpt for maintenance purpose. (593.00)
Numbering and re-numbering lines. (583.00)
Installing and removing conv. and csp transformers. (583.00)
Installing and removing OCBs and sectionalizers. (583.00)
Installing and removing Capacitors. (583.00)
Testing and Repairing OCR. (593.00)
Repair line test equipment. (593.00)
Chemical treatment of R/W. (593.00)
Load tests and voltage surveys. (583.00)
Transmission line work that is not construction/ retirement in nature. (571.00)
Lines – Underground
Replacement or new installation of primary, secondary and service wire. (107.20)
Replacement or new installation of ALL junctions (such as ND-8 and ND-24) (107.20)
Replacement or new installation of HL-45’s and HL-54’s or any other vault and/or lid. (107.20)
Replacement/ installation of arrester elbow, bushing arrester, parking stand arrester. (107.20)
Replacement or new installation of grounding units (complete). (107.20)
Replacement or new installation of ALL secondary pedestals. (107.20)
Replacement or new installation of ALL switchgear. (107.20)
Replacement or new installation of ALL conduit. Excluding wood moulding. (107.20)
Replacement or new installation of wood moulding. (594.00)
Trimming trees and clearing brush for NEW underground lines. (107.20)
Reroutes of underground service less than (10) feet. (594.00)
Underground line outages and partial powers. (594.00)
Locating UG lines. (584.00)
Installing and removing PM, RR and submersible transformers. (584.00)
Yard work. (584.00)
Transferring loads, switching / reconnecting circuits and equipment for ops purposes. (584.00)
Repairing safeguard wire UG. (593.00)
Maintenance of underground conduits, conductors and devices and UG services. (594.00)
Load Management
Load management activities such as installing/removing load control switches. (581.00)
Work concerning voltage control in connection with load control. (581.00)
Record keeping relating to load management activities. (581.00)
Meter
Setting meter pole. (456.11)
Disconnecting and reconnecting, removing and re-installing meters. (586.00)
Sealing and unsealing meters. (586.00)
Changing and relocating meters. (586.00)
Inspecting and testing meters. (586.00)
Numbering meters. (586.00)
Keeping all records relating to meters. (586.00)
Maintenance of meters and test equipment. (597.00)
Repairing meter bases. (597.00)
Reading meters, including demand meters and obtaining load information for billing. (902.00)
Reading routes normally read by system meter readers. (902.00)
Work orders involving meter reader problems. (902.10)
Showing routes to new readers. (902.10)
Park 30
Work required for work in Park 30. (421.40)
Pole
Replacement or new installation of all poles. (107.20)
Replacement or new installation of individual arresters and cutouts. (107.20)
Replacement or new installation of crossarms. (107.20)
Replacement or new installation of complete anchor and guy assemblies. (107.20)
Replacement or new installation of primary, secondary and service wire. (107.20)
Installing pole top disconnects. (456.11)
Setting meter poles or pole consumer buys. (456.11)
Billable work on consumers’ premises-setting meter poles or pole consumer buys. (456.11)
Moving position of service either on pole or on consumer’s premises. (593.00)
Replacement of Anchor or guy separately. (593.00)
retying or rearranging position of conductors, guy markers. (593.00)
Treating poles or crossarms. (593.00)
Realignment and straightening poles and fixtures. (593.00)
Leaning out of existing pole, etc. during Sys. Imp. (593.00)
Recondition reclaimed pole fixtures. (593.00)
Retirement
Retirement labor involved in replacing items mentioned in construction section. (108.80)
Retirement labor involved in retiring but not replacing items mentioned in construction section. (108.80)
Vegetation
Trimming trees and clearing brush for NEW overhead or underground lines. (107.20)
Trimming trees and clearing brush for existing lines. (593.10)
Trimming trees and clearing brush for transmission line. (571.00)
*Tree clearing for new lines should be charged to the appropriate construction work order.*
Warehouse /Shop/ Maintenance
Unloading and putting material in storage. (163.00)
Getting material from stock in readiness to go out. (163.00)
Inventorying stock received or stock on hand. (163.00)
Maintain stock records. (163.00)
Maintain stores equipment. (163.00)
Housekeeping of material storage areas (excluding transportation area). (163.00)
Collecting and handling scrap material. (163.00)
Repairs of temporaries (including materials purchased). (163.00)
Maintenance of transportation and garage equipment. (184.10)
Housekeeping of transportation garage area. (184.10)
Maintenance of trenchers. (184.11)
Housekeeping of trencher related garage area. (184.11)
Maintenance of tools (excluding transportation and trenchers) (598.00)
Maintenance of shop (excluding transportation and trenchers) (598.00)
Maintenance of garage equipment (excluding transportation and trenchers) (598.00)
Maintenance of power operated equipment (excluding transportation and trenchers) (598.00)
Snow removal–parking lot–sidewalks, etc. (932.00)
Misc. painting and various other items. (932.00)
Records/Mapping/Meetings
Annual Meeting. (930.26)
Physical characteristics of lines and substations records. (588.00)
Ground resistance records. (588.00)
Voltage and load records. (588.00)
Service interruption records. (588.00)
All mapping activities including GPS. (588.00)
Meeting/training not related to a specific dept. attended by outside ops employees. (588.00)
Records for transformers–including numbering. (588.00)
Record keeping relating to load management activities. (581.00)
Keeping all records relating to meters. (586.00)
Data Processing. (184.30)
Supervision
General supervision and direction of the operations of the distribution system. (580.00)
General supervision and direction of the maintenance of the distribution system. (590.00)
Work Plan
Work associated with periodic distribution plant work plan. (183.00)